Project Experience
Project Name | Owner/Client | Contact Value | Period | Workspace |
Umm Al Houl IWPP Project | Umm Al Houl Power Company | USD 30,000,000 | 2016 | Piping Work : 310,000 DI Commisioning Assistance |
ASC Phase VI VCM | Asahimas Chemical/Lotte E & C Co., Ltd. | USD 7,280,000 | 2014 | Steel Structure Erection : 1,745 Ton Equipment Erection : 2,082 Ton Piping Work : 173,013 DI Painting & Insulation Work |
Hankook Tire Ph 2 Indonesia | Hankook Tire Indonesia / Lotte E&C | USD 4,200,000 | 2014 | Equipment Erection : 50 Ton Piping Work : 18,460 DI Fire Fighting : 33,100 M Commisioning Assistance |
Prai CCGT Project Malaysia | TNB Northern Bhd. / Samsung C&T | USD 5,500,000 | 2014 | Piping Work : 78,500 DI Commisioning Assistance |
Cilacap RFCC Project Indonesia | PT. Pertamina / GS E&C | USD 16,200,000 | 2013 | Steel Structure Erection : 2,660 Ton Equipment Erection : 2,810 Ton Piping Work : 240,000 DI |
Additional Clay Storage Kalimantan, Indonesia | PT. Indocement Tbk. | USD 375,000 | 2013 | Steel Structure Fabrication & Erection |
EMAL Ph 2 CCPP Project - 1023 MW, UAE | Emirate Aluminium / Samsung C & T | USD 12,700,000 | 2012 | Piping Work : 154,200 DI Commisioning Assistance |
Hankook Tire Indonesia | Hankook Tire Indonesia / Lotte E & C Co., Ltd. | USD 5,000,000 | 2011 | Equipment Erection Piping Work Commissioning Assistance |
Piping Engineering J Project, Indonesia | PT. Cheil Jedang Indonesia | USD 500,000 | 2011 | Basic Design & Piping Design Drawing & As-Built |
UAE S2 IWPP Project 1,310 MW & 100 MIGD, UAE | Ruwais Power Company / Samsung C & T | USD 17,750,000 | 2009 | Piping Work: 260,000 DI Commissioning Assistance |
Cirebon Coal Firing Power Plant (660MW 1 Unit), Indonesia | Cirebon Elektric Power / Doosan Heavy Industry | USD 3,300,000 | 2009 | Piping Work : 100,000 DI Commissioning Assistance |
New Jetty - B4 Project Kalimantan, Indonesia | PT. Indocement Tbk. | USD 2,000,000 | 2008 | Piling & Jetty Installation Dredging |
OBL & Revamping for L-Project - Lube Base Oil Plant | PT. Pertmanina & SK Energy | USD 4,392,000 | 2007 | Equipment Erection : 792 tons Piping Work : 209,000 DI Commisioning Assistance |
Khurais Dentral Gas Facilities Khurais, Saudi Arabia | Saudi Arabia Oil Company (Aramco Energy) / Hyundai E & C | USD 5,000,000 | 2007 | Piping Work : 25,000 DI Commissioning Assistance |
AL-EZZEL Power Plant 4 Unit HRSG Bahrain | Al-Ezzel Power Co. Doosan Heavy Industri | USD 2,745,000 | 2006 | Equipment Erection Piping Work : 98,000 DI |
Bulk Loading Conveyor 1.000 MTPH Conveyor Kalimantan, Indonesia | PT. Indocement Tbk. | USD 1,975,000 | 2006 | Design & Procurement for Conveyor System Civil & Foundation Steel Structure Erection Equipment Erection Electric & Instrument Commissioning Assistance |
Steam Line Gresik East Java, Indonesia | PT. Petrowidada | USD 176,000 | 2006 | Piping Work |
Methanol Recovery Gresik East Java, Indonesia | PT. Petrowidada | USD 130,000 | 2006 | Steel Structure Erection Equipment Erection Piping Work |
Dismantling PA No. 2 Plant Gresik East Java, Indonesia | PT. Petrowidada | USD 245,000 | 2005 | Dismantling & Recondition |
Drying & Washing Column Bio Diesel Plant Gresik, Indonesia | PT. Anugerah Intitama | USD 75,000 | 2005 | Equipment Erection |
Steam & Hydrant for PA Plant Gresik East Java, Indonesia | PT. Petrowidada | USD 295,000- | 2004 | Tank Repair Piping Fab. & Installation Electrical Commissioning |
Dismantle for PA 1 & MA Plant Gresik, East Java, Indonesia | PT. Petrowidada | USD 250,000- | 2004 | Dismantle & Recondition Plant |
Coal & Laterite Storage BLDG, Kalimantan, Indonesia | PT. Indocement Tbk. | USD 570,000- | 2003 | Civil & Foundation Steel Structure Fab. & Erection |
Piping Engineering P Project Jombang, Indonesia | PT. Cheil Jedang Indonesia | USD 150,000- | 2003 | Basic Design & Piping Design Drawing & As-Built |
Muara Tawar GTPP Project 6 x 143 MW Gas Tbn Power Plant | PT. PLN / Samsung C & T Co., Ltd. | USD 2,475,000- | 2003 | Equipment Erection Piping Fab. & Installation : 45,000 DI Commissioning |
Refinery / Formentation Plant Jombang, Indonesia | PT. Cheil Jedang Indonesia | USD 1,400,000- | 2003 | Piping Fab. & Installation : 120,000 DI |
Furnace Steel Work Tuban, East Java, Indonesia | Stone & Webster, UK | USD 780,000- | 2002 | Dismantle & Recondition of Furnace System |
Suban Gas Plant Suban, Sumatra, Indonesia | Gulf Indonesia / Hyundai E & C Co., Ltd. | USD 455,000- | 2002 | Field Tank Erection |
Paper Bag Storage & Hydrant System Kalimantan, Indonesia | PT. Indocement Tbk. | USD 150,000- | 2002 | Civil & Foundation Steel Structure Fab, & Erection Equipment Fab. & Erection Piping Fab. & Installation |
Thermal Incineration Unit Exhaust Gas Firing Gresik, East Java, Indonesia | PT. Petrowidada / Envirotech, Germany | USD 1,600,000- | 2001 | Main Reactor Fab. & Erection Civil & Foundation Steel Structure Fab. & Erection Equipment Fab. & Erection, Piping Fab. & Installation Electric & Instrument Refractory Insulation, Start Up & Commissioning |
Jetty Bulk Loader Modification Kalimantan, Indonesia | PT. Indocement Tbk. | USD 200,000- | 2001 | Steel Structure Fab. & Erection Equipment Fab. & Erection Piping Fab. & Installation Commissioning |
Sumpal Gas Plant Sumpal, Sumatra, Indonesia | Gulf Indonesia / Hyundai E & C Co., Ltd. | USD 75,000- | 2001 | Field Tank Erection |
Scrubber Unit Gresik, East Java, Indonesia | PT. Petrowidada | USD 200,000- | 2001 | Equipment Fab. & Erection Piping Fab. & Installation |
FCFC Aroma II, Chemical Plant Mai-Liau Comlex Taiwan | Formosa Corporation / Daelim Industri Co., Ltd. | USD 6,000,000- | 2000 | Steel Structure : 11.800 tons Equipment Erection : 8.600 tons Piping Fab. & Installation : $ 20.000 DI Maintenance & Commissioning |
ASPEX Substantion 70KV Cibinong, Indonesia | PT. Aspex / Hyundai E & C Co., Ltd. | USD 60,000- | 2000 | Electrical |
Darajat Geotherm Power Plant 55MW Geotherm Darajat, West Java, Indonesia | PT. Amoseas Indonesia / Hyundai E & C Co., Ltd | USD 420,000- | 1999 | HVAC |
Bosowa Cement Plant Ujung Pandang, Indonesia | PT. Bosowa Cement / Daewoo E & C Co., Ltd | USD 120,000- | 1999 | HVAC |
Irian Jaya Go-Gen Power Plant 13MW Wood Chip Firing Irian Jaya, Indonesia | PT. Korindo / Hyundai E & C Co., Ltd. | USD 500,000- | 1998 | Equipment Erection Piping Fab. & Installation Refractory, Electric & Instrument Insulation, Commissioning |
Paiton Steam Power Plant 1.200 MW Coal Firing Paitong, East Java, Indonesia | PT. PLN / Shinwha Construction | USD 5,500,000- | 1998 | Piping Fab. Installation : 1,124 tons Fire Fighting, Electrical, Insulation, Commisioning |
TPPI Olefine Plant Tuban East Java, Indonesia | PT. TPPI / Daelim Industri Co., Ltd. | USD 4,600,000- | 1997 | Steel Structure Erection Piping Fab. & Installation |
O-Xylene & Raw Water Storage Tank 10.000 & 2.000 M3 Gresik East Java, Indonesia | PT. Petrowidada | USD 950,000- | 1997 | Tank Fab. & Erection Piping Fab. & Installation |
PA Storage Tank 1.000 M3 Gresik East Java, Indonesia | PT. Petrowidada / LG E & C Co., Ltd. | USD 400,000- | 1997 | Equipment Erection : 328 tons Piping Fab. & Installation : 120 tons Refractory 98 tons Electric & Instrument, Insulation, Commissioning |
Butyl Acetate Plant 20.000 MTPY Merak, West Java, Indonesia | PT. Petrowidada | USD 540.000- | 1997 | Equipment Erection Piping Fab. & Installation, Commissioning |
MA Chemical Plant 3.000 MTPY Gresik, East Java, Indonesia | PT. Petrowidada | USD 470,000- | 1996 | Equipment Erection Piping Fab. & Installation electric & Instrument, Commissioning |
Miwon Go-Gen Power Plant 13 MW Wood Chip Firing Irian Jaya, Indonesia | PT. Miwon Indonesia | USD 560,000- | 1996 | Tank Fab. & Erection, Piping Fab. &Installation Steal Tracing Jacket |
Irian Jaya Go-Gen Power Plant 13MW Wood Chip Firing Seram Island, Indonesia | PT. Korindo / Hyundai E & C Co., Ltd. | USD 600,000- | 1995 | Equipment Erection : 328 tons Piping Fab. & Installation : 120 tons Refractory 98 tons Electric & Instrument, Insulation, Commissioning |
Seram Go-Gen Power Plant 13MW Wood Chip Firing Seram Island, Indonesia | PT. PLN / Hyundai E & C Co., Ltd. | USD 595,000- | 1995 | Equipment Erection : 1,024 tons Piping Fab. & Installation : 120 tons Refractory 428 tons Electric & Instrument, Insulation, Commissioning |
Miwon Go-Gen Power Plant 6 MW Gas Tbn 1 & 2 Unit Surabaya. Indonesia | PT. Miwon Indonesia | 5,000,000- | 1995 | Equipment Erection : 382 tons Piping Fab. & Installation : 120 ton Refractory 98 tons Electric & Instrument, Insulation, Commissioning |
Paiton Steam Power Plant 400 MW Coal Firing Paitong, East Java, Indonesia | PT. PLN / Hyundai E & C Co., Ltd. | USD 4,890,000- | 1994 | Equipment Erection : 2,548 tons Piping Fab. & Installation : 1,124 Fuel Oil Storage Tan Commissioning |
Darajat Geotherm Power Plant 55MW Geotherm Darajat, West Java, Indonesia | PT. PLN / Hyundai E & C Co., Ltd. | USD 540,000- | 1994 | Equipment Erection Piping Fab. & Installation HVAC Commissioning |
Semen Cibinong Phase III 6.000 MTPD Cement Plant Cibinong, West Java, Indonesia | PT. Semen Cibinong / Hyundai E & C Co., Ltd. | USD 6,700,000- | 1992 | Steel Structure Erection : 2,637 tons Equipment Erection : 8,071 tons Piping Fab. & Installation : 426 tons Commissioning |
GRATI CCPP (Peaker) Ext. Project 450MW | PT. Indonesia Power | USD 10,600,000 | 2017 | Piping Work : 97,000 DI Equipment Erection : 10,000 Ton Painting and Insulation Work Commissioning Assistance |